logo
Zhejiang Huier Coating Environmental Protection Equipment Co., Ltd
products
products
Home > products > Electrophoretic Coating Equipment > Casting Electrophoretic Coating Production Line

Casting Electrophoretic Coating Production Line

Product Details

Place of Origin: zhejiang

Brand Name: huier

Payment & Shipping Terms

Get Best Price
Highlight:

Electrophoretic Coating Production Line

,

Casting Electrophoretic Coating Production Line

Electrophoresis Tank Hole:
D1-10 Mm
Epoxy Curing:
18±2%
Coating Speed:
1-10 Meters Per Minute
Coating Color:
Various Colors
Coating Environmentally Friendly:
Yes
Product Type:
Coating Equipment
Coating Type:
Electrophoretic
Coating Method:
Electrophoresis
Warranty:
12 Months
Application:
Electrophoretic Coating
Coating Thickness:
10-50 Microns
Coating Efficiency:
High
Coating Corrosion Resistance:
Excellent
Coating Hardness:
High
Voltage:
0-300V
Electrophoresis Tank Hole:
D1-10 Mm
Epoxy Curing:
18±2%
Coating Speed:
1-10 Meters Per Minute
Coating Color:
Various Colors
Coating Environmentally Friendly:
Yes
Product Type:
Coating Equipment
Coating Type:
Electrophoretic
Coating Method:
Electrophoresis
Warranty:
12 Months
Application:
Electrophoretic Coating
Coating Thickness:
10-50 Microns
Coating Efficiency:
High
Coating Corrosion Resistance:
Excellent
Coating Hardness:
High
Voltage:
0-300V
Casting Electrophoretic Coating Production Line

Equipment Description:

 

The casting electrophoretic coating production line is transported in the form of a hanging chain. The main workpiece material is cast iron. The whole set of equipment includes pre-treatment + spraying process. The process flow is loading → pre-degreasing → main degreasing → water washing → pure water washing → silane → pure water washing → automatic water blowing → electrophoresis → UF0 → UF1 → pure water washing → fresh pure water washing → automatic water blowing → dripping → electrophoresis curing → cooling → powder spraying → paint curing → natural cooling → unloading. In the whole production process, the process is perfect, the process equipment is advanced; the operating conditions are safe and good, and the workshop environment is clean.

 

Main structures and components:

 

1. Composition of pre-treatment equipment Pre-treatment includes shed, liquid storage tank, spray system, tank liquid circulation and stirring system, tank liquid heating and temperature control system, exhaust system, water blowing device and supporting waste gas treatment system. The waste gas recovery system meets national standards and is discharged after passing through the cyclone tower equipment. 2. Composition of powder spraying equipment The powder spraying room includes the powder spraying room, air supply and exhaust system, two-stage powder recovery system, lighting system, etc. The process of the recovery system is that the powder that is not powdered when spraying the workpiece enters the recovery system, and the large powder is separated by the rotation of the large cyclone, so that the relatively large powder settles in the recovery powder barrel at the bottom, passes through the recovery powder pump, enters the vibrating screen, and the powder after screening enters the powder barrel for secondary use. The remaining powder will enter the secondary recovery through the vent at the top of the large cyclone, filter through the filter element, separate, and the clean air is discharged to the outside or the operation workshop. The powder enters the secondary recovery powder barrel at the bottom through pulse backblowing to achieve the recovery effect. 3. Main structure of the equipment The overall equipment is designed with a reasonable and effective design, which can withstand the additional force caused by the unbalanced wind pressure when the equipment is started and the overall load-bearing capacity, so as to achieve structural optimization.

 

Features:

 

① High cost performance Based on the customer's product positioning and development strategy, based on economic benefits, to achieve the best cost performance. ② Advanced equipment The design concept of continuous improvement and industrial equipment with a high degree of automation show the style of modern advanced enterprises. ③ High adaptability Meet the current production requirements and reserve development space, considering the needs of later production increase and quality improvement. ④ Quality compliance Strictly follow the IS0900 quality management system, and strictly control every small link of the entire equipment installation.

 

Casting Electrophoretic Coating Production Line 0